General preparation, Flown setup, Prerequisites, flown setup – KLING & FREITAG K&F SEQUENZA 5 W User Manual

Page 30: Sequenza 5 flying frame preparation, flown setup, 2 general preparation, 3 flown setup 9.3.1 prerequisites, flown setup, 2 sequenza 5 flying frame preparation, flown setup

Advertising
background image

User's manual

K&F SEQUENZA 5 incl. accessories

KLING & FREITAG GMBH © 2015

Version 4.1

Page 30 of 88

9.2

General Preparation

Warning

See the instructions in chapter 'Safety Instructions' from page 14 and in the corresponding
sub-section 'Safety Instructions for Flown Setup' from page 15.

Control the secure fit of every ball lock pin during setup.

Simulate the desired configuration with the simulation software CON:SEQUENZA+ and
determine the necessary tilt angle of every speaker. On the rear joint plate of the speakers,
there are drill holes with the corresponding angles marked.

Tip

Print out the results of the simulation so that you can check the settings at any given time
and so you have a documentation of the settings.

Before setup, adjust the tilt angle of every speaker.

9.3

Flown Setup

9.3.1

Prerequisites, Flown Setup

Warning

See the instructions in chapter 'Safety Instructions' from page 14 and in the corresponding
sub-section 'Safety Instructions for Flown Setup' from page 15.

Control the secure fit of every ball lock pin during setup.

Preparation: You should have simulated the desired speaker configuration with the provided
software CON:SEQUENZA+ and printed out the results. You can only be certain that the
configuration is not overloaded if you have done the simulation. Aside from this, the
software provides information about the tilt angles of the individual speakers.

You should have set the necessary tilt angle on every speaker.

9.3.2

SEQUENZA 5 Flying Frame Preparation, Flown Setup

Warning

If a BGV (government safety organisation) C1 or a D8+ motor is used, the SEQUENZA 5 system
is intrinsically safe and does not require any secondary securing. If the SEQUENZA 5 system
is, however, to be hung on another motor, then secondary securing is necessary. This can be
attached to the 3.5t shackles and must be implemented with zero drop height. Instructions
for the correct use of secondary securing with zero drop height are in the standard VPLT
(Assoc. of Media and Event Technology) SR 2.0 "Preparation & use of electric chain hoists".

Before speaker setup, you must prepare the SEQUENZA 5 flying frame completely.

You can calculate one- and two-strand riggings with the simulation software CON:SEQUENZA
+. For one-strand rigging, use one load adapter; for two-strand rigging, use two load
adapters.

The drill holes on the flying frame where the load adapters are to be attached are
determined by the simulation software CON:SEQUENZA. CON:SEQUENZA+You will find the
specifications on the relevant calculation printouts. The specification of the drill hole in the
simulation software refers to the drill hole in the load adapter that is facing the front side of
the frame. The front side of the frame is marked with a sticker (Front).

With the required second ball lock pin, the connection in the next drill hole is secured.

The drill holes in the flying frame are numbered consecutively from 1 to 22, beginning on the
front end of the frame (Front). For your orientation, the drill holes 1 to 5 and 11 to 15 are
labelled.

Advertising