Fronius Energy Package User Manual

Page 105

Advertising
background image

103

EN

EVU Editor – Con-
trol priorities

1 = highest priority, 3 = lowest priority

(1)

For setting the control priorities for the ripple control signal receiver

(2)

For setting the control priorities for dynamic power reduction

(3)

For setting the control priorities for control via Modbus

(4)

“Apply/Save” button

(5)

“Cancel/Discard entry” button

EVU Editor – Bat-
terie Ladung [Bat-
tery charging]

If you want the Fronius Solar Battery to be charged from the public grid, you can activate
this here. Depending on what is required by standards or the feed-in tariff rules, it may be
necessary to deactivate the setting.
This setting does not affect the charging of the Fronius Solar Battery by other producers
within the home. It merely relates to the process of drawing charging energy from the public
grid.
Regardless of this setting, any charging from the public grid that is required for service rea-
sons (e.g. to protect against deep discharge) is still performed.

(1)

(2)

(3)

(4)

(5)

Advertising