Verify operation, Verify operation -2 – Yaskawa F7 Modbus User Manual

Page 7

Advertising
background image

Connections 1-2

Verify Operation

Connect power to the F7 drive and verify that the F7 drive functions properly. This includes running the F7 drive from the operator keypad.

Refer to the F7 Drive User Manual, for information on connecting and operating the F7 drive.

Remove power from the F7 drive and wait for the charge lamp to be completely extinguished. Wait at least five additional minutes for the F7

drive to be completely discharged. Measure the DC bus voltage and verify that it is at a safe level.
Remove the operator keypad and terminal cover.























Figure 1.1 – F7U Diagram

Advertising
This manual is related to the following products: