15 scheduling snapshots – Avago Technologies MegaRAID Fast Path Software User Manual
Page 425

LSI Corporation Confidential
|
July 2011
Page 425
MegaRAID SAS Software User Guide
Chapter 11: Using MegaRAID Advanced Software
|
Recovery Advanced Software
2. In the Select Capacity field, use the drop-down selector to select the appropriate
capacity to use for changes to the base virtual drive.
3. Click Next.
The Enable MegaRAID Recovery – Create Snapshot Schedule wizard appears, as
shown in
This wizard lets you to
schedule the snapshots.
11.2.15 Scheduling Snapshots
You can select an existing snapshot schedule or create a new snapshot schedule for the
virtual drive.
Follow these steps to schedule snapshots.
1. Select any one of the options shown in the Enable MegaRAID Recovery - Create
Snapshot Schedule wizard, as shown in the following figure, to schedule snapshots.
Figure 289: Enable MegaRAID Recovery - Create Snapshot Schedule Dialog
- MegaRAID SAS 9240-4i MegaRAID SAS 9240-8i MegaRAID SAS 9260-16i MegaRAID SAS 9260-4i MegaRAID SAS 9260-8i MegaRAID SAS 9261-8i MegaRAID SAS 9280-16i4e MegaRAID SAS 9280-4i4e MegaRAID SAS 9280-8e MegaRAID SafeStore Software MegaRAID SAS 9361-4i MegaRAID SAS 9361-8i MegaRAID SAS 9266-4i MegaRAID SAS 9266-8i MegaRAID SAS 9270-8i MegaRAID SAS 9271-4i MegaRAID SAS 9271-8i MegaRAID SAS 9271-8iCC MegaRAID SAS 9286-8e MegaRAID SAS 9286CV-8e MegaRAID SAS 9286CV-8eCC MegaRAID CacheCade Pro 2.0 Software MegaRAID SAS 9341-4i MegaRAID SAS 9341-8i MegaRAID SAS 9380-8e MegaRAID SAS 9380-4i4e