Lull 6K Service Manual User Manual

Page 222

Advertising
background image

Supply, Pressure, and Return Hydraulics

5-78

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Removal

Pump Unloader Valve

Fig. 5-47: Pump Unloader Valve Installation - Control Manifold Hydraulics

(Ref. Fig. 5-47) The following procedure describes removal of the pump
unloader valve.

1. Follow preparation procedures as outlined in Section 3 of this manual.

Be sure to follow the guidelines in this section detailed under “General
Hydraulic Maintenance Practices” on page 5-4.

2. Install brake pressure diagnostic port test gauge into brake diagnostic

port (see page 5-90).

3. While watching test gauge, press brake pedal numerous times until

pressure gauge reads 0 psi. Remove test gauge from diagnostic port.

4. For 644B, 844C, and 1044C models, refer to roll-back hose tray

removal procedures on page 5-94.

5. To avoid contamination of the system, clean pump unloader valve.

K

1112

#

Description

1

Capscrew

2

Mounting Bracket

3

Hydraulic Hose

4

Elbow

5

Hydraulic Hose

6

Elbow

7

Hydraulic Hose

8

Elbow

9

Elbow

#

Description

10 Hydraulic Hose
11 Nut
12 Lockwasher
13 Pump Unloader Valve
14 Hydraulic Hose
15 Elbow
16 Elbow
17 Hydraulic Hose

2

1

3

4

5

6

17

15

16

11

12

14

10

9

7

8

13

Advertising