Lull 6K Service Manual User Manual

Page 384

Advertising
background image

Boom and Transfer

6-134

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Fig. 6-143: Securing Lower Chain

40. (Ref. Fig. 6-143) Adjust the lower chain by tightening the chain

adjustment rod (Item 3). Stop tightening just prior to the chain being
taunt. Align the notch in the head of adjustment rod (Item 3) with the
threaded hole in anchor base (Item 4). Secure the adjustment rod with
a lockwasher (Item 2) and capscrew (Item 1). Torque the capscrew to
75 in-lbs.

41. Attach the upper chains to the chain anchors on the top of the outer

boom. Machines were manufactured with three types of chain anchors.
These are shown below. Follow the steps for the machine with the
appropriate serial number.

J

1105

#

Description

1

Capscrew

2

Lockwasher

#

Description

3

Chain Adjustment Rod

4

Anchor Base

1

2

3

4

Advertising