Lull 6K Service Manual User Manual

Page 579

Advertising
background image

Brakes

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

9-5

The brake testing and bleeding procedure is complete.

Accumulator Pre-charge

15. The following procedure is for adjusting accumulator pre-charge (from

Step 7 above).

a. If test gauge pressure reads too high, slowly turn out gauge

bleeding valve (Item 4) to release pressure and tighten when
375–425 psi on accumulator gauge (Item 5) is indicated.

b. If test gauge pressure reads too low, charge accumulator as

described in “Pre-Charging Accumulator” on page 9-19 (through
Step 12).

c. If correct pressure cannot be achieved, replace accumulator,

reinstall test gauge, and adjust accumulator to correct pressure.

d. Return to Step 8 under “Testing and Bleeding” and continue.

Advertising