Lull 6K Service Manual User Manual

Page 529

Advertising
background image

Frame Tilt and Oscillation

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

7-27

3. If necessary (models with a cylinder as illustrated in View A), install

mounting base (Item 12) with four (4) each capscrews (Item 7),
lockwashers (Item 10), and nuts (Item 11). Torque nuts to 280 ft-lbs.

4. If necessary (models with a cylinder as illustrated in View A), install

bushing (Item 20) in rear axle boss. Install bushing so that it is
centered in axle boss

5. Position lower cylinder pivot on axle and install lower pivot pin. Secure

pin with lock pin (Item 8), lockwasher (Item 2), and capscrew (Item 4).
Torque capscrew to 55 ft-lbs.

6. Attach hydraulic hoses to fittings on oscillation control block. Torque

nut on #8 hose (Item 6) to 44–48 ft-lbs. Torque nuts on #6 hoses
(Item 5) to 235–265 in-lbs (20–22 ft-lbs).

7. For models with a cylinder as illustrated in View A, connect electrical

lead from wiring harness (Item 17) at oscillation control block.

8. If necessary, install grease fittings (Items 13 and 19) and grease fitting

covers (Items 14 and 18). Torque grease fittings 1.5–3 turns past finger
tight. Lubricate upper and lower pivots with grease.

9. Start engine and cycle frame tilt fully left and right several times to

purge air from hydraulic system. Lower boom and shut off engine.

10. Inspect for hydraulic leaks and repair as necessary.

11. Check oil level in hydraulic reservoir and add as necessary. See “Filling

Hydraulic Reservoir” in Section 5 for procedures.

Advertising