38. (Ref. Fig. 6-141) Install the anchor base assembly to the bottom of the

middle boom section with six (6) lockwashers and capscrews. Install
the shortest capscrew in the hole illustrated above. Torque this
capscrew to 280 ft-lbs. Torque the other five (5) capscrews to 200 ft-
lbs.

Fig. 6-142: Front Slide Pads Installation, Outer Boom

39. (Ref. Fig. 6-142) Install the top and side slide pads and shims on the

outer boom section according to drawing specifications. See
“Shimming Procedures” on page 6-91 for details.

a. Install the shims and slide pads with two (2) each lockwashers and

button head socket capscrews.

b. Torque the capscrews to 65 ft-lbs.

0

80

6 0

4 0

2 0

- 2 0

J

1091

J

128

0

3

1

2

4

#

Description

1

Button Head Socket Capscrew

2

Lockwasher

#

Description

3

Shim

4

Slide Pad

Advertising