Lull 6K Service Manual User Manual

Page 447

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-197

Fig. 6-210: Slide Pad Installation – Inner Boom Section

26. (Ref. Fig. 6-210) After applying thread locking compound to the

capscrews, install two (2) lower and two (2) side slide pads (Items 1
and 2) on inner boom section according to drawing specifications with
lockwashers (Item 3) and capscrews (Item 4). Torque capscrews to
180 in-lbs.

Fig. 6-211: Grease Hose Installation

27. (Ref. Fig. 6-211) Install grease hose assembly on rear of inner boom

section as follows:

a. Install two (2) elbows (Item 3) on inside of inner boom section

making sure elbows are in correct position for grease hose to be
connected.

J

1

247

1

2

3

4

4

3

#

Description

1

Lower Slide Pad

2

Side Slide Pad

#

Description

3

Lockwasher

4

Button-Head Socket Capscrew

J

123

5

3

5

1

4

6

2

#

Description

1

Grease Hose

2

Inner Boom Section

3

Elbow

#

Description

4

Bulkhead Adapter

5

Grease Fitting

6

Grease Fitting Cover

Advertising