Lull 6K Service Manual User Manual

Page 460

Advertising
background image

Boom and Transfer

6-210

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

DANGER: Support of the boom is essential to avoid the possibility of

injury or death should the boom fall. To avoid personal and/or
equipment damage, support the hydraulic cylinder before
removing any additional hardware securing cylinder to the
boom. Use suitable blocking and lifting devices when
removing heavy machine components.

4. Loosen and remove two (2) hydraulic tubes (Item 10) from elbows

(Item 9) on boom extension cylinder (Item 5). Bleed any remaining oil
into a suitable container. Cap fittings and tubes.

5. Loosen two (2) socket setscrews (Item 2) in rod nut (Item 1).

6. Loosen and remove rod nut and rod boss (Item 3) securing boom

extension cylinder to front of middle (rear) boom section (Item 4).

7. Loosen and remove hardware securing extension cylinder to outer

boom section (Item 6) as follows.

For Models 1044C-54 (S/N 101–143) and 10K-54 (S/N 101–103)
(See View A):

Remove two (2) each capscrews (Item 15), lockwashers (Item 16), and
flatwashers (Item 17) securing extension cylinder base mount
(Item 18) to outer boom section.

For Models 1044C-54 (S/N 144–) and 10K-54 (S/N 104–):

Remove two (2) each nuts (Item 14), capscrews (Item 7), and
flatwashers (Item 8) securing extension cylinder base mount (Item 11)
to outer boom section. Also, remove the shim(s) (Items 12 and 13).

8. Slowly remove the cylinder from the machine and take it to a location

suitable for inspection and disassembly.

9. Clean remaining parts with solvent and dry with compressed air.

Inspect for damage and replace as necessary.

Installation, Extension Cylinder

The following steps are required to install the boom extension cylinder
(Ref. Fig. 6-225).

1. Using sling(s), crane, or other suitable means, position rod end of

cylinder (Item 5) in its proper location on the middle (rear) boom
section (Item 4).

WARNING: To avoid personal and/or equipment damage, make sure the

cylinder is properly supported until it is completely installed.

2. Secure cylinder to middle (rear) boom section with rod boss (Item 3)

and rod nut (Item 1).

Advertising