Page 341

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-91

Shimming Procedures

3-Section Boom

Fig. 6-89: Boom Slide Pad Locations, 3-Section Boom

1. Park the machine on a firm, level surface and apply the park brake.

Level the frame. Level and fully retract the boom. Shut off the engine.

2. Determine if all boom slide pads are serviceable. (See “Slide Pad

Inspection” on page 6-48). Have replacement pads ready as required.

Note: Use thread locking compound on retaining hardware when installing slide

pads.

#

Description

1

Boom Pad, 3/4" Thick x 2" Wide

2

Boom Pad, 9/16" Thick x 2" Wide

3

Boom Pad, 9/16" Thick x 2" Wide

4

Boom Pad, 7/16" Thick x 2" Wide

#

Description

5

Boom Pad, 3/4" Thick x 1-1/4"
Wide

6

Boom Pad, 3/4" Thick x 3" Wide

7

Boom Pad, 5/8" Thick x 3" Wide

3

2

2

2

2

2

2

1

6 or 7

2 or 4

2

2

2

1

2

NOTE:

7 are load bearing

Items 1, 3, 6, and

J1022

pads.

5

NOTE: Items 4 and 7 were used with early production units.

Items 2, 5, and 6 are used on models with the following serial numbers:

644B-42 (S/N 142–), 6K-42 (S/N 114–), 844C-42 (S/N 434–),
8K-42 (S/n 193–), 1044C-42 (S/N 111–), 10K-42 (S/N 101–)