Lull 6K Service Manual User Manual

Page 449

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-199

Fig. 6-213: Upper Slide Pad Installation – Front of Middle (Forward) Boom

Section

31. (Ref. Fig. 6-213) After applying thread locking compound to the

capscrews, install two (2) upper slide pads (Item 4) and shims (Item 3)
on front of middle (forward) boom section with lockwashers (Item 2)
and capscrews (Item 1) according to drawing specifications. Torque
capscrews to 180 in-lbs.

32. Lift middle (forward) and inner boom sections and slide them into

middle (rear) boom section.

Fig. 6-214: Upper Chain and Hose Reel Assembly – Middle (Forward) Boom

J

1245

1

2

3

4

#

Description

1

Button-Head Socket Capscrew

2

Lockwasher

#

Description

3

Shim

4

Front Upper Slide Pad

J

1244

7

8

9

10

1

2

2

3

6

5

4

#

Description

1

Upper Chains

2

Lock Nut

3

Upper Chain Anchor

4

Capscrew

5

Lockwasher

#

Description

6

Chain Anchor Rod

7

Hose Reel

8

Capscrew

9

Lockwasher

10 Hose Reel Pin

Advertising