Lull 6K Service Manual User Manual

Page 450

Advertising
background image

Boom and Transfer

6-200

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

33. (Ref. Fig. 6-214) Install upper chains and hose reel assembly on

middle (forward) boom section as follows:

a. Install two (2) hose reels (Item 7) to rear of boom section with hose

reel pins (Item 10). Secure each pin to boom section with
lockwasher (Item 9) and capscrew (Item 8). Torque capscrews to
216 in-lbs.

Fig. 6-215: Rear Slide Pad Installation

34. (Ref. Fig. 6-215) After applying thread locking compound to the

capscrews, install remaining slide pads (Items 2 and 12) and shims
(Item 10) on rear of boom sections with lockwashers (Item 7) and
capscrews (Item 8). Torque slide pad capscrews to 180 in-lbs.

Note: See “Shimming Procedures” on page 6-147 for details in

determining the number of shims that will be required when
performing Steps 34 and 37.

35. (Ref. Fig. 6-215) Install slide pad retainers (Item 3) with flatwashers

(Item 4), lockwashers (Item 5), and capscrews (Item 6). Torque
capscrews to 200 ft-lbs.

J

1257

1

2

3

4

5

6

7

8

9

2

10

3

4

7

8

5

6

11

2

10

10

12

8

7

8

7

3 4

5

6

#

Description

1

Inner Boom Section

2

Upper Slide Pad

3

Slide Pad Retainer

4

Flatwasher

5

Lockwasher

6

Capscrew

#

Description

7

Lockwasher

8

Button-Head Socket Capscrew

9

Middle (Forward) Boom Section

10 Shim
11 Middle (Rear) Boom Section
12 Side Slide Pad

Advertising