Lull 6K Service Manual User Manual

Page 358

Advertising
background image

Boom and Transfer

6-108

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Fig. 6-113: Hose Connections, 3-Section Boom

21. (Ref. Fig. 6-113) Disconnect hoses from the tubes at the rear of the

outer boom section as follows.

a. Tag and disconnect two (2) boom extension hoses (Item 3) at the

rear of the inner boom. Cap the tubes and hoses.

b. Tag and disconnect two (2) carriage tilt hoses (Item 2), and two (2)

auxiliary hydraulics hoses (Item 1) at the boom. Cap tubes and
hoses.

22. Place a sling around the front of the inner boom section. Chains with

hooks may be attached to the rear of the outer boom section near the
pivot pin bosses (Ref. Fig. 6-114). Attach a sling and chains to a crane
hook. Lift the boom using a crane strong enough to support the weight
of the boom.

CAUTION: Make sure the crane, slings, and chains have sufficient

capacity to support the weight of the boom section. The
weight of the entire 3-section boom assembly is approximately
5,400 pounds.

J1077

1

2

3

4

#

Description

1

Auxiliary Hydraulic Hoses

2

Carriage Tilt Hoses

#

Description

3

Boom Extension Hoses

4

Boom Extension Cylinder

Advertising