Lull 6K Service Manual User Manual

Page 313

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-63

Fig. 6-57: Lower Shim Installation – Front of 2-Section Boom

4. (Ref. Fig. 6-57) Install/remove shim(s) under indicated pads to obtain

clearance specified in Step 3.

Fig. 6-58: Upper Shim Installation – Front of 2-Section Boom

5. (Ref. Fig. 6-58) Install/remove shim(s) under indicated pads to obtain

specified clearance.

J1046

Install shim(s) under

these pads

J1050

0.063"–0.125"

(1/16"–1/8") gap

between boom and

pads

Install shim(s)

under these pads

Advertising