Shimming procedures – Lull 6K Service Manual User Manual

Page 397

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-147

Shimming Procedures

4-Section Boom

Fig. 6-154: Boom Slide Pad Locations – 4-Section Boom

1. Park machine on firm, level surface and apply park brake. Level the

frame. Level and fully retract the boom. Shut off engine.

2. Determine if all boom slide pads are serviceable. (See “Slide Pad

Inspection” on page 6-48). Have replacement pads ready as required.

Fig. 6-155: Boom Section Gaps – Front of 4-Section Boom

0

80

60

40

20

-20

0

80

60

40

20

-20

J

1160

1

1

3

1

1

1

2

2

2

2

2

2

2

2

2

2

2

2

NOTES: Items 1 and 3 are load bearing pads

2

#

Description

1

Boom Pad, 1" Thick x 3" Wide

2

Boom Pad, 9/16" Thick x 2" Wide

3

Boom Pad, 3/4" Thick x 3" Wide

#

Description

4

Boom Pad, 3/4" Thick x 1-1/4"
Wide

4

Item 4 is included with the following models only:

1044C-54 (S/N 117–) and 10K-54 (S/N 104–)

J

1161

0.75"–1.00"

0.67"–0.82"

0.62"–0.74"

(5/8"–3/4")

(3/4"–1")

(11/16"–13/16")

Advertising