Lull 6K Service Manual User Manual

Page 497

Advertising
background image

Boom and Transfer

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

6-247

Overhaul

Transfer Cylinder

Fig. 6-258: Transfer Cylinder Assembly

(Ref. Fig. 6-258) The following steps are required to overhaul the transfer
cylinder.

1. Remove the connector (Item 3) from the cylinder barrel (Item 2).

2. Remove dowel pin (Item 1) from cylinder barrel.

3. Mount or support cylinder vertically with rod end down. Hydraulic oil in

cylinder will drain out during disassembly. Place a suitable pan or tray
under the cylinder.

4. Using the three (3) holes in the side of the rod bearing head (Item 8)

install a spanner wrench and remove the head.

5. Remove the cylinder rod assembly from cylinder barrel.

CAUTION: To prevent possible damage to components, support cylinder

rod assembly; pull rod or head straight out during removal.

6. Remove rod nut (Item 4), piston (Item 5), stroke limiter (Item 6), from

cylinder rod (Item 7).

J

114

0

1

3

2

4

5

6

7

8

#

Description

1

Dowel Pin

2

Cylinder Barrel

3

Connector

4

Rod Bearing Nut

#

Description

5

Piston

6

Stroke Limiter

7

Rod

8

Rod Bearing Head

Advertising