Lull 6K Service Manual User Manual

Page 446

Advertising
background image

Boom and Transfer

6-196

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Fig. 6-209: Hydraulic Hose and Tube Installation – Inner Boom Section

23. (Ref. Fig. 6-209) Install auxiliary and front carriage tilt cylinder

hydraulic hoses and tubes as follows:

a. Connect hydraulic hoses (Item 1) to carriage tilt hydraulic tubes

(Item 4). Torque swivel nuts on hydraulic tubes to 50–58 ft-lbs.

b. Connect hydraulic hoses (Item 2) to auxiliary hydraulic tubes

(Item 5). Torque swivel nuts on hydraulic tubes to 50–58 ft-lbs.

c. Install auxiliary and front carriage tilt hydraulic tubes on channels

(Item 6) in inside of inner boom section with cushion clamps
(Item 3) as described in Substep d under Step 2 on page 6-185.

24. Install front carriage tilt cylinder in inner boom (See page 6-19).

25. Install auxiliary hydraulic quick disconnects

J

1246

3

4

5

6

1

2

#

Description

1

Auxiliary Hydraulic Hoses

2

Carriage Tilt Hydraulic Hoses

3

Cushion Clamp

#

Description

4

Auxiliary Hydraulic Tubes

5

Carriage Tilt Hydraulic Tubes

6

Mounting Channel

Advertising