Lull 6K Service Manual User Manual

Page 452

Advertising
background image

Boom and Transfer

6-202

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Fig. 6-217: Lower Chain Installation – Inner Boom Section

39. Install lower chain (Item 2) from inside middle (rear) boom section to

rear chain anchor (Item 4) at rear of inner boom section with shoulder
bolt (Item 3) and lock nut (Item 1). Torque lock nut to 108 in-lbs.

Fig. 6-218: Lower Chain Installation – Middle (Forward) Boom Section

40. Install lower chain assembly from inside outer boom section to middle

(front) boom section as follows:

a. Install lower chain anchor (Item 6) on lower chain (Item 4) with

shoulder bolt (Item 5) and lock nut (Item 1). Torque lock nut to 108
in-lbs.

b. Install lower chain anchor on rear of boom section with two (2)

lockwashers (Item 3) and capscrews (Item 2). Torque capscrews to
280 ft-lbs.

J

1255

4

1

3

2

#

Description

1

Lock Nut

2

Lower Chain

#

Description

3

Shoulder Bolt

4

Rear Chain Anchor

J

1256

1

5

4

3

2

6

#

Description

1

Lock Nut

2

Capscrew

3

Lockwasher

#

Description

4

Lower Chain

5

Shoulder Bolt

6

Lower Chain Anchor

Advertising