Lull 6K Service Manual User Manual

Page 394

Advertising
background image

Boom and Transfer

6-144

Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K

Overhaul, Extension Cylinder

Fig. 6-152: 3-Section Boom Extension Cylinder Assembly

(Ref. Fig. 6-152) The following steps are required to overhaul the boom
extension cylinder.

1. Mount or support cylinder vertically with rod end down. Hydraulic oil in

cylinder will drain out during disassembly. Place a suitable pan or tray
under the cylinder.

2. Release pressure in counterbalance valve cartridges (Items 2 and 3)

as follows:

WARNING: Counterbalance valve cartridges trap hydraulic pressure in the

cylinder. Wear proper eye and hand protection when removing
counterbalance valve cartridges. Hydraulic fluid under
pressure can be injected under skin or into eyes, resulting in
serious personal injury or death.

a. Place socket wrench over counterbalance valve cartridge. Wrap a

clean shop rag around the socket to cover the area of the
counterbalance valve cartridge.

b. Carefully and slowly, turn cartridge out of manifold block to release

pressure in cylinder.

3. Remove the counterbalance valve cartridges.

4. Slowly extend and retract cylinder by hand to remove most of the

hydraulic oil.

J

1132

#

Description

1

Hollow Hex O-ring Plug

2

Counterbalance Valve Cartridge

3

Counterbalance Valve Cartridge

4

Cylinder Barrel

5

Rod Nut

#

Description

6

90° O-ring Elbow

7

Piston

8

Rod Bearing Head

9

Capscrew

10 Cylinder Rod

2

1

6

3

4

5

10

9

8

7

Advertising