Figure 4.1 control and signal terminal blocks – Rockwell Automation 1336Z SPIDER - FRN 2.xxx-5.xxx User Manual

Page 40

Advertising
background image

4–2

Installation/Wiring for PLC Control Drives

Cable Routing

If unshielded cable is used, signal circuits should not run parallel to
motor cables or unfiltered supply cables with a spacing less than 0.3
meters (1 foot). Cable tray metal dividers or separate conduit should
be used.

Important: When user installed control and signal wiring with an

insulation rating of less than 600V is used, this wiring must
be routed inside the drive enclosure and separated from
any other wiring and/or uninsulated live parts.

Figure 4.1
Control and Signal Terminal Blocks

PWR
RUN
STOP
FAULT

TB1

TB2

1
2
3
4
5
6
7

8
9
10
11
12
13
14
15
16

17
18
19

20
21
22
23
24
25

26
27
28
29
30

24VC
24V

TB3

TB4

TB5

TB6

TB7

PWR
RUN
STOP
FAULT

TB1

TB2

1
2
3
4
5
6
7

8
9
10
11
12
13
14
15
16

17
18
19

20
21
22
23
24
25

26
27
28
29
30

24VC
24V

TB3

TB4

TB5

TB6

TB7

Advertising