4–2
Installation/Wiring for PLC Control Drives
Cable Routing
If unshielded cable is used, signal circuits should not run parallel to
motor cables or unfiltered supply cables with a spacing less than 0.3
meters (1 foot). Cable tray metal dividers or separate conduit should
be used.
Important: When user installed control and signal wiring with an
insulation rating of less than 600V is used, this wiring must
be routed inside the drive enclosure and separated from
any other wiring and/or uninsulated live parts.
Figure 4.1
Control and Signal Terminal Blocks
PWR
RUN
STOP
FAULT
TB1
TB2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
24VC
24V
TB3
TB4
TB5
TB6
TB7
PWR
RUN
STOP
FAULT
TB1
TB2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
24VC
24V
TB3
TB4
TB5
TB6
TB7
Advertising