Ventilation Requirements

This section provides information to assist you in sizing your cabinet
and locating your 1394 system components. Refer to Figure 1.2 for
minimum clearance requirements for power rail components mounted
inside the cabinet.

Figure 1.2
Minimum System and Axis Module Mounting Requirements

Refer to Appendix A for 1394 power dissipation specifications.

Status

Status

DANGER

RISK OF ELECTRICAL SHOCK. HIGH VOLTAGE MAY

EXIST UP TO FIVE MINUTES AFTER REMOVING POWER.

D

ANGER

RISK OF ELECTRICAL SHOCK.

HIGH

VOL

TAGE MA

Y

EXIST

UP TO

FIVE

MINUTES AFTER

REMOVING

POWER.

50.8 mm (2.0 in.) clearance

for airflow and installation

Allow additional clearance below the system module to provide the recommended cable bend radius. Refer

to the Motion Control Selection Guide (publication GMC-SG001x-EN-P) for more information.

Allow 10.0 mm (0.4 in.) side clearance

Allow 76.2 mm (3.0 in.) clearance

for depth of terminator.

Wire entry area for cable ground clamps

and signal, power, and motor connections.

Allow 10.0 mm (0.4 in.) side clearance

Allow 25.4 mm (1.0 in.) clearance

at cover tab for opening and closing.

IMPORTANT

If the cabinet is ventilated, use filtered or
conditioned air to prevent the accumulation of dust
and dirt on electronic components. The air should be
free of oil, corrosives, or electrically conductive
contaminates.