Setting the ground jumper in ungrounded power, Configurations -6, Setting the ground jumper in 5 and 10 kw – Rockwell Automation 1394 SERCOS Interface Multi-Axis Motion Control System Installation Manual User Manual

Page 60: System modules -6

Advertising
background image

Publication 1394-IN002B-EN-P — February 2004

3-6

Connecting Your 1394 SERCOS Interface System

Setting the Ground Jumper
in Ungrounded Power
Configurations

These procedures assumes that you have bonded and mounted your
system module to the subpanel and that there is no power applied to
the system.

Setting the Ground Jumper in 5 and 10 kW System Modules

This procedures applies to 1394C-SJT05-D and -SJT10-D system
modules. To set the ground jumper for an ungrounded system:

1. Verify that all 24V logic and main input power has been removed

from the system.

2. Open the system module door.

3. Remove the three control board screws (refer to Figure 3.3 for

locations).

4. Remove ribbon cable from control board (refer to Figure 3.3 for

location).

Note: You should not find it necessary to remove both ends of the

ribbon cable. Remove only the control board end.

5. Remove the control board for easy access to ground jumpers (pull

it straight out from system module).

6. Locate the jumper connecting J4 and J5 on the assembly adjacent

to the control board, and move one end of the jumper from J5 to
J6 (refer to Figure 3.3 for locations).

7. Re-install the control board. Align the guide pins in the rear of the

enclosure with the holes in the control board.

8. Re-install ribbon cable into the control board connector.

9. Re-install the three control board screws.

10. Close the system module door.

11. Go to Grounding Your 1394 SERCOS Interface System.

IMPORTANT

If you have grounded power distribution, you do not
need to set the ground jumper. Go to Grounding
Your 1394 SERCOS Interface System.

Advertising