Mounting your 1394 sercos interface system, Mounting your 1394 sercos interface system -18 – Rockwell Automation 1394 SERCOS Interface Multi-Axis Motion Control System Installation Manual User Manual

Page 28

Advertising
background image

Publication 1394-IN002B-EN-P — February 2004

1-18

Installing Your 1394 SERCOS Interface System

Mounting Your 1394
SERCOS interface System

The procedures in this section assume you have prepared your panel
and understand how to bond your system. For installation instructions
regarding equipment and accessories not included here, refer to the
instructions that came with those items.

1. Layout the position for your 1394 in the enclosure (refer to

Establishing Noise Zones for panel layout recommendations).
Mounting hole dimensions for the 1394 are shown in Appendix A.

Note: For help with the mounting hole layout for any combination

of axis modules, refer to Determining Your System Mounting
Hole Layout
on page 1-8.

2. Install the top mounting fasteners on the subpanel for the system

module and all axis modules. The heads of the fasteners should be
at least 6.35 mm (0.25 in.) from the panel. Make sure the 1394 is
properly bonded to the subpanel. Refer to the section HF Bonding
Your System
f
or proper bonding techniques.

3. Hang the 1394 system module on the two fasteners on the left side

of the subpanel.

ATTENTION

!

This drive contains ESD (Electrostatic Discharge)
sensitive parts and assemblies. You are required to
follow static control precautions when you install,
test, service, or repair this assembly. If you do not
follow ESD control procedures, components can be
damaged. If you are not familiar with static control
procedures, refer to Allen-Bradley publication 8000-
4.5.2, Guarding Against Electrostatic Damage or any
other applicable ESD Protection Handbook.

IMPORTANT

To improve the bond between the 1394 and
subpanel, construct your subpanel out of zinc
plated (paint-free) steel.

Advertising