T-309

Table 3-7 Controller Pre-Trip Test Codes (Sheet 1 of 4)

Code

No.

TITLE

DESCRIPTION

NOTE

“Auto” or “Auto1” menu includes the: P0, P1, P2, P3, P4, P5, P6 and rSLts. “Auto2” menu

includes P0, P1, P2, P3, P4, P5, P6, P7, P8, P9, P10 and rSLts.

P0--0

Pre-Trip Initiated

All lights and display segments will be energized for five seconds at the start of

the pre-trip. Since the unit cannot recognize lights and display failures, there are

no test codes or results associated with this phase of pre-trip.

P1-0

Heaters Turned On

Setup: Heater must start in the OFF condition, and then be turned on. A current

draw test is done after 15 seconds.

Pass/Fail Criteria: Passes if current draw change is within the range specified.

P1-1

Heaters Turned Off

Setup: Heater must start in the ON condition, and then be turned off. A current

draw test is done after 10 seconds.

Pass/Fail Criteria: Passes if current draw change is within the range specified.

P2-0

Condenser Fan On

Requirements: Water pressure switch or condenser fan switch input must be

closed.

Setup: Condenser fan is turned ON, a current draw test is done after 15 seconds.

Pass/Fail Criteria: Passes if current draw change is within the range specified.

P2-1

Condenser Fan Off

Setup: Condenser fan is turned OFF, a current draw test is done after 10 sec-

onds.

Pass/Fail Criteria: Passes if current draw change is within the range specified.

P3

Low Speed Evapora-

tor Fans

Requirements: The unit must be equipped with a low speed evaporator fan, as

determined by the Evaporator Fan speed select configuration variable.

P3-0 Low Speed Evapora-

tor Fan Motors On

Setup: The high speed evaporator fans will be turned on for 10 seconds, then off

for two seconds, then the low speed evaporator fans are turned on. A current

draw test is done after 60 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range speci-

fied. Fails if AL11 or AL12 activates during test.

P3-1 Low Speed Evapora-

tor Fan Motors Off

Setup: The low speed Evaporator Fan is turned off, a current draw test is done

after 10 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range speci-

fied. Fails if AL11 or AL12 activates during test.

P4-0

High Speed Evapo-

rator Fan Motors On

Setup: The high speed Evaporator Fan is turned on, a current draw test is done

after 60 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range speci-

fied. Fails if AL11 or AL12 activates during test.

P4-1

High Speed Evapo-

rator Fan Motors Off

Setup: The high speed Evaporator Fan is turned off, a current draw test is done

after 10 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range speci-

fied. Fails if AL11 or AL12 activates during test.

P5-0 Supply/Return Probe

Test

Setup: The High Speed Evaporator Fan is turned on and run for eight minutes,

with all other outputs de-energized.

Pass/Fail Criteria: A temperature comparison is made between the return and

supply probes.

NOTE

If this test fails, “P5-0” and “FAIL” will be displayed. If both Probe tests
(this test and the PRIMARY/ SECONDARY) pass, the display will read
“P5” “PASS.”