Table 3-7 Controller Pre-Trip Test Codes (Sheet 2 of 4)

P5-1

Supply Probe Test

Requirements: For units equipped with secondary supply probe only.

Pass/Fail Criteria: The temperature difference between primary and secondary probe

(supply) is compared.

NOTE

If this test fails, “P5-1” and FAIL will be displayed. If both Probe tests (this

and the SUPPLY/ RETURN TEST) pass, because of the multiple tests, the
display will read ’P 5’ ’PASS’.

P5-2

Return Probe Test

Requirements: For units equipped with secondary return probe only.

Pass/Fail Criteria: The temperature difference between primary and secondary

probe (return) is compared.

NOTES

1. If this test fails, “P5-2” and “FAIL” will be displayed. If both Probe tests

(this test and the SUPPLY/ RETURN) pass, because of the multiple

tests, the display will read “P 5,” “PASS.”

2.

The results of Pre-Trip tests 5-0, 5-1 and 5-2 will be used to activate or

clear control probe alarms.

P6

Refrigerant Probes,

Compressor

and

Refrigeration valves

Setup: The system is operated through a sequence of events to test the compo-

nents. The sequence is: Step 1, de--energize all outputs; Step 2, start unit with

unloader valve open. Open then close the suction modulation valve. Monitor

suction pressure; Step 3, open suction modulation valve to a known position;

Step 4, close suction modulation valve to a know position; Step 5, open econo-

mizer valve; Step 6, close unloader valve; Step 7, open unloader valve; Step 8,

close economizer valve; Step 9, de--energize all outputs.

P6-0

Discharge

Thermistor Test

If alarm 64 is activated any time during the first 45 second period of Step 1, the

test fails.

P6-1

Suction

Thermistor Test

If alarm 69 is activated any time during the first 45 second period of Step 1, the

test fails.

P6-2

Discharge Pressure

Sensor Test

If alarm 65 is activated any time during the first 45 second period of Step 1, the

test fails.

P6-3

Suction Pressure

Sensor Test

If alarm 66 is activated any time during the first 45 second period of Step 1, the

test fails.

P6-4

Compressor Current

Draw Test

Compressor current is tested before and after start up. If current does not in-

crease, the test fails.

P6-5

Suction Modulation

Valve Test

Suction pressure is measured before and after the valve opens. If suction pres-

sure does not increase, the test fails.

P6-6

Economizer

Valve Test

Suction pressure is measured during Steps 4 and 5. If suction pressure does not

increase, the test fails.

P6-7

Unloader Valve Test Suction pressure is measured during Steps 6 and 7. If suction pressure does not

increase, the test fails.