6-11

T-309

c. Determine which heater(s) need replacing by check-

ing resistance on each heater. Refer to paragraph 2.3

for heater resistance values

d. Remove hold-down clamp securing heaters to coil.
e. Lift the bent end of the heater (with the opposite end

down and away from coil). Move heater to the side

enough to clear the heater end support and remove.

6.16 ECONOMIZER, UNLOADER, LIQUID INJEC-

TION AND OIL RETURN SOLENOID VALVE

a. Replacing the Coil

NOTE

The coil may be replaced without removing the
refrigerant.

1 Be sure electrical power is removed from the unit.

Disconnect leads. Remove top screw and washer.

Lift off coil. (See Figure 6-14 or Figure 6-15)

2 Verify coil type, voltage and frequency of old and

new coil. This information appears on the coil hous-

ing.

b.

Replacing Valve Internal Parts (Unloader

Solenoid Only)

1 Pump down the unit. Refer to paragraph 6.4.
2 Be sure electrical power is removed from the unit.

Disconnect leads. Remove top screw and washer.

Lift off coil. (See Figure 6-14)

3 Remove the top screw (see Figure 6-14), washer ,

and coil assembly.

4 Loosen the enclosing tube locknut.
5 Remove enclosing tube and locknut assembly. The

gasket is inside the enclosing tube.

6 Remove seat disc from inside of body and check for

obstructions and foreign material.

7 Place the seat disc into the valve body with the small-

er diameter end facing up.

8 Install stem and plunger.
9 Place the enclosing tube locknut over the enclosing

tube. Install spacer over enclosing tube making sure

it is seated properly in the enclosing tube locknut.

Tighten enclosing tube locknut to a torque value of

2.78 mkg (20 ft-lb). Do not overtighten.

10 Install coil assembly, washer and top screw.
11 Evacuate and dehydrate the system. (Refer to section

6.6.) Charge unit with refrigerant per section 6.7.

12 Start unit and check operation.
c.

Replacing Valve

1 To replace the unloader, liquid injection or econo-

mizer valve, pump down the unit. Refer to paragraph

6.4. To replace the oil return valve, remove the re-

frigerant charge.

2 Be sure electrical power is removed from the unit.

Disconnect leads. Remove top screw and washer.

Lift off coil. (See Figure 6-14 or Figure 6-15)

3 Unbraze valve from unit and braze new valve in

place

4 Install coil. Evacuate low side and place unit back

in operation. Check charge.

1

9

8

7

6

5

4

3

2

1. Top Screw

2. Washer

3. Coil

4. Locknut

5. Enclosing Tube

6. Gasket

7. Stem and Plunger

8. Seat Disc

9. Body

Figure 6-14. Unloader Solenoid Valve

1
2

3

4

1. Slotted Screw

2. Washer

3. Coil

4. Enclosing Tube and

Body

Figure 6-15. Oil Return Solenoid Valve (ORV),

Economizer Solenoid Valve (ESV), Liquid

Injection Solenoid Valve (LIV)

6.17 EVAPORATOR FAN AND MOTOR ASSEMBLY

The evaporator fans circulate air throughout the

container by pulling air in the top of the unit. The air is

forced through the evaporator coil where it is either

heated or cooled and then discharged out the bottom of

Advertising