1 one power supply operation, Connections, one power supply operation – TE Technology TC-720 User Manual

Page 18

Advertising
background image

1.3.1

ONE POWER SUPPLY OPERATION:

Make sure the power supply is NOT energized while making electrical connections to the controller.

The output voltage of the TE Power Supply should not exceed the maximum desired input voltage of the

thermoelectric device, or the rated input voltage of the cooling assembly.

Connect the DC voltage power supply (output voltage: ≥12 V but ≤36 V) to the controller as follows:

a) Connect wire between Positive (+) terminal of the power supply and JP7-4.

b) Connect wire between Negative (-) terminal of the power supply and JP7-3.

c) See Section 1.4 for further information on connecting the TE device.

Connections, One Power Supply Operation

JP7

JP2

1

2

3

4

10

9

8

7

6

5

4

3

2

1

(+)

(-)

TE DEVICE

DC

POWER SUPPLY

OPTIONAL FUSE
THERMOSTAT AND OTHER
PROTECTIVE DEVICES
(CUSTOMER SUPPLIED)

OPTIONAL

SECONDARY

SENSOR

JP2-4 (+) and

JP2-3 (-)

CONTROL
SENSOR
JP2-1 (+) and
JP2-2 (-)

12 V, 36 V, 20 A maximum

JP7

PIN 1

JP2

PIN 1

WIRES MUST PASS THROUGH

RUBBER FACE-PLATE HOLES

NOTE: LID IS REMOVED TO SHOW

WIRE CONNECTIONS

USB COMMUNICATION PORT

to JP7-1

to JP7-2

to JP7-3

to JP7-4

18

Advertising
This manual is related to the following products: