Chapter 2: installation, Unpack the vtrak – Promise Technology VTrack M-Class M200i User Manual

Page 19

Advertising
background image

11

Chapter 2: Installation

Unpack the VTrak storage subsystem (below)

Mount VTrak M500f/i/p in a Rack (page 12)

Mount VTrak M300f/i/p or M200f/i/p in a Rack (page 14)

Install Disk Drives (page 16)

Set Up Network Cable Connections (page 20)

Set Up Serial Cable Connections (page 25)

Connect the Power (page 26)

Unpack the VTrak

The VTrak box contains the following items:

VTrak Unit

Quick Start Guide

Null Modem Cable

Left and right mounting rails

1.0m External VHDCI SCSI
cables (2 for M500p/M300p, 1
for M200p)

Screws for disk drives
(36 for M200f/i/p; 52 for M300f/i/p;
64 for M500f/i/p; including 4 spares)

1.5m (4.9 ft) Power cords (2)

CD with SNMP files, Product
Manual
and Quick Start Guide

Warning

The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.

Important

Use the following categories of network cables with VTrak:

Cat 6, preferred

Cat 5E, minimum

Advertising
This manual is related to the following products: