Replace sep - m500f/i/p, Replace sep – m500f/i/p – Promise Technology VTrack M-Class M200i User Manual

Page 243

Advertising
background image

Chapter 6: Maintenance

235

Replace SEP – M500f/i/p

The Storage Enclosure Processor (SEP) manages the fans, audible alarm, and
battery, and monitors system voltages and cooling functions. No tools are
required for this procedure.

To remove and replace the SEP, do the following:

1.

Power down the VTrak.

2.

Grasp the handle and pull it toward you (above, left).

3.

Holding the handle, pull the SEP out of the enclosure (above, center).

4.

Gently slide the new SEP into the enclosure.

5.

Press on the screen to seat the SEP (above, right). The handle will swing in
as the SEP is properly seated.

6.

Power up the VTrak.

This completes the Storage Enclosure Processor replacement procedure.

Caution

The SEP is NOT a hot-swappable device. Power-down the VTrak
before removing it.

Important

Do not replace the SEP based on LED colors alone. Only replace
the SEP when directed to do so by Promise Technical Support.
See page 299.

Advertising
This manual is related to the following products: