Scheduler, View scheduled activities, Schedule an activity – Promise Technology VTrack M-Class M200i User Manual

Page 80

Advertising
background image

VTrak M-Class Product Manual

72

Medium allocates a balance of system resources to the function and
data read/write operations.

High allocates more system resources to the function and fewer to data
read/write operations.

5.

Set the Reassigned Block threshold.

When an error occurs in a physical drive, the directions to the block
containing error are reassigned. When the number of reassigned blocks
exceeds the threshold, PDM is triggered.

6.

Set the Error Block threshold.

When an error occurs in the data or the physical media in a disk drive, the
block is marked and added to the block error count. When the number of
error blocks exceeds the threshold, PDM is triggered.

7.

Check the boxes to enable Media Patrol.

For more information, see “Media Patrol” on page 257.

8.

Check the boxes to enable Auto Rebuild.

Auto Rebuild enables rebuilding of a disk array when a suitable hot spare
drive is available. For more information, see “Hot Spare Drive(s)” on
page 253.

9.

When you are done, click the Submit button.

Scheduler

The Subsystem–Scheduler tab enables you to view and assign scheduled
background activities on a specific subsystem.

Scheduled activities include:

Media Patrol. See “Physical Drive Media Patrol” on page 128

Redundancy Check. See “Logical Drive Redundancy Check” on page 146

Battery Reconditioning. See “Battery Recondition” on page 121

Spare Drive Check. See “Spare Check – All Spare Drives” on page 152

View Scheduled Activities

To view scheduled activities for this subsystem:

1.

Click on the Subsystem

icon Tree View.

2.

Click on the Scheduler tab in Management View.

Schedule an Activity

To set a scheduled activity for this subsystem:

1.

Click on the Subsystem

icon Tree View.

2.

Click on the Scheduler tab in Management View.

Advertising
This manual is related to the following products: