Promise Technology VTrack M-Class M200i User Manual

Page 290

Advertising
background image

VTrak M-Class Product Manual

282

Rebuild

Rebuild is started

Result of settings or user action. Normal.

Rebuild is completed

Normal.

Rebuild is paused

Rebuild paused because of user intervention,
schedule or a higher priority background activity.

Rebuild is resumed

Rebuild has resumed again after a pause.

Rebuild is stopped

Rebuild stopped because of user intervention,
schedule or the logical drive was deleted or the target
disk drive encountered an error. If rebuild stopped by
user intervention, restart the rebuild. See page 138.

Rebuild stopped internally The logical drive is offline. See page 286.

Rebuild is aborted due to
an internal error.

System resources are low. Reduce system load or
restart the VTrak. See page 218.

Rebuild is queued

Rebuild has been set manually or by schedule.

Rebuild marks logical
drive synchronized upon
rebuild completion

Result of successful rebuild. Normal.

Redundancy Check

Redundancy Check is
started

Redundancy Check has started manually or by
schedule.

Redundancy Check is
completed

Redundancy Check has finished.

Redundancy Check is
paused

Redundancy Check paused because of user
intervention, schedule or a higher priority background
activity.

Redundancy Check is
resumed

Redundancy Check has resumed again after a
pause.

Redundancy Check is
stopped

Redundancy Check stopped because of user
intervention, schedule or the logical drive was deleted
or went critical or offline.

Redundancy Check is
aborted due to internal
error

System resources are low. Reduce system load or
restart the VTrak. See page 218.

Redundancy Check
encountered inconsistent
block(s)

Check the logical drive’s inconsistent block table. See
page 147. Rebuild the disk array if necessary.
page 138.

Event

Action

Advertising
This manual is related to the following products: