0 operation, 1 start-up and test – Alpha Technologies XM2, XM2-HV, XM2-HP User Manual

Page 53

Advertising
background image

Fig. 4-1, Configuration Screen

4.0 Operation

4.1 Start-up and Test

4.1.1 AC Line Operation

1. Before making power supply connections, verify the correct voltage and

frequency are available from the AC utility power source and voltage and
polarity from the DC battery system.

2.

Verify the AC circuit breaker (on the customer supplied service disconnect) and
the battery breaker on the power supply are off.

3. Plug the power cord into the convenience outlet and the battery cable into the

inverter module. Plug the RTS into the temp probe connection and attach it to
the center battery. Refer to Fig. 1-9. At this time, if an LRI is installed, connect it
to the front panel connector labeled LRI.

4.

Switch the AC (service disconnect) circuit breaker on to start initial power

up. During this stage the power supply performs a “display test” and verifies

configuration for the power supply. After the initial display test, a “No Batteries”
alarm message appears in the Smart Display because the battery breaker is

off. The green output LED remains off and the red alarm LED continues to flash
while in this alarm state.

Access the configuration screen any time by simultaneously pressing UP and ENTER.

NOTE:

i2M OUT

FREQ

BAT IN

90V 15A 60Hz

36V 120

53

017-805-B0-010 Rev. K2

Advertising