<Appendix B. Device Information>

B-1

IM 01C25R51-01E

Appendix B. Device Information

B-1 Start up Procedure of Device and

FlowNavigator

(1) digitalYEWFLO and DYFMVTool
The flow chart below shows the start-up procedure of digitalYEWFLO and DYFMVTool.
Set digitalYEWFLO F

OUNDATION

fieldbus according to the chart and then proceed to

"DYFMVTool -Flow Configuration-" and "DYFMVTool -Confirm Flow Configuration-".

digitalYEWFLO -Initial Setting-

- Connect the Device to the Power Supply
- Connect the Device to the Segment

START

digitalYEWFLO -Confirm F

OUNDATION

fieldbus Setting-

- Address setting

- Tags (PD Tag and VFD Tag) setting

DYFMVTool -Flow Configuration-

- Upload and edit Device General Parameters

using DYF (SoftDL) F

OUNDATION

fieldbus DTM

- Configure Device Flow Parameters

using Flow Configuration Wizard

- Download Device Parameters

using DYF (SoftDL) F

OUNDATION

fieldbus DTM

digitalYEWFLO -Configure AR Block-

- Scheduling digitalYEWFLO AR Block and

connected other devices AI Block

- Wiring digitalYEWFLO AR Block

END

FB0101E.ai

DYFMVTool -Confirm Flow Configuration-

Case1: AR Block is standalone

- Set input conditions in AR Block

(digitalYEWFLO starts flow calculation)

- Confirm output in AR Block

Case2: AR Block is connected with other devices

- Set input conditions in Connected Device's AI Block

(digitalYEWFLO starts flow calculation)

- Confirm input conditions in AR Block

- Confirm output in AR Block

Refer to Section 8.3

Refer to Section 8.3

Refer to Chapter 6

Refer to Section 4.5

Refer to Section 4.5

Figure B1.1 Start up Procedure of digitalYEWFLO and DYFMVTool