1 device, 2 install communication device, 3 communication setting – Yokogawa EJX930A User Manual

Page 52: 4 connect the device to the power supply, 5 connect the device to the segment, Initial setting (f, Oundation, Fieldbus communication) -23, Device -23, Install communication device -23

Advertising
background image

<4. Preparation>

4-23

IM 01C25R51-01E

4.5 Initial Setting (F

OUNDATION

fieldbus

Communication)

NOTE

Regarding start up procedure of the device, refer to following:

EJX Multivariable Transmitter: User’s Manual IM01C25R01-01E “EJX910A and EJX930A

Multivariable Transmitters”

digitalYEWFLO Vortex Flowmeter: Appendix B-1

4.5.1 Device

Address and Tags (PD Tag and VFD Tag) must be set in the device.

IMPORTANT

Use function block scheduling and connection tool for DYFMVTool. After using these setting tool,

finish the program before starting FlowNavigator.

4.5.2 Install Communication Device

Install the Communication Device on PC.

4.5.3 Communication Setting

Refer to Appendix D-2 for Communication Device Setting.

4.5.4 Connect the Device to the power supply

(1) For EJX Multivariable Transmitter

Refer to User’s manual IM 01C25 R03-01E “EJX910A and EJX930A Fieldbus

Communication Type.”

(2) For digitalYEWFLO Vortex Flowmeter

Refer to User’s manual IM 01F06F00-01E “Model DY Vortex Flowmeter, Model DYA Vortex

Flow Converter, Fieldbus Communication Type”

4.5.5 Connect the Device to the Segment

Advertising
This manual is related to the following products: