Important – Yokogawa EJX930A User Manual

Page 152

Advertising
background image

<Appendix B. Device Information>

B-5

IM 01C25R51-01E

Step 4 Set function block scheduling information

Arrange any function block shown in Table B2.1 or Table B2.2 on the "Function Block Application"

screen.

IMPORTANT

In “Case 2: AR Block is connected with other devices”, arrange digitalYEWFLO AR Block at the

end.

Otherwise, digitalYEWFLO will not carry out the flow calculation correctly.

FB0205E.ai

Drug & Drop

Figure B2.5 How to configure the function block scheduling

Double-click "Schedule" at the left of the screen to confirm the execution sequence of arranged

function blocks.
The figure below describes the sequence in “Case 2: AR Block is connected with other devices”.

FB0206E.ai

Figure B2.6 After double clicking “Schedule”

Proceed to < Step 6 > if there is no need to set the function block connection.

Advertising
This manual is related to the following products: