3 folder prm_dpv1_sfb" ć parametrizing via dpv1, Folder prm_dpv1_sfb" ć parametrizing via dpv1 – Festo Контроллер двигателя SFC-ST User Manual

Page 42

Advertising
background image

2. Installation and project overwiev

2−14

Festo P.BE−SFC−DC−PB−S7−E N en 0604NH

2.3.3

Folder PRM_DPV1_SFB" ć parametrizing via DPV1

The most important blocks in the folder PRM_DPV1_SFB" for
parametrizing the controller via DPV1 are listed in Tab. 2/5.
Additional blocks, e.g. for fault treatment or data blocks, etc.
are not listed.

Block

Name

Purpose

Description

Access

Function

OB1

Main

Cyclic program
access

Main program routine

FB21

Example
project

FB21

PRM_DPV1_SFB

Parametrizing
(DPV1)

FB for parametrizing
via DPV1 using
SFB52/53

SFB52/53 Festo control

block

DB91

GV−PRM

Parametrizing

Contains the global
control variables for
parametrizing

ć

Example
project

PARAMETERIZE−DRIVE

Parametrizing

Variable table for
parametrizing

ć

Example
project

Tab. 2/5:

Overview of the most important blocks of the folder PRM_DPV1_SFB"

Block FB21 for parametrizing the SFC−DC via DPV1 is
implemented in OB1. The global variables for parametrizing
are saved in DB91. With the aid of the variable table
PARAMETERIZE−DRIVE the controller can be parametrized via
PROFIBUS.

Advertising