JLG G6-42P Service Manual User Manual

Page 88

Advertising
background image

Section 5 - Attachments

5-26

31200148

Installation Procedure:

• Refer to “Attachment Installation” on page 5-7.

Operation:

• Approach load with forks centered on load and stop telehandler.

• Level telehandler before side tilting carriage to engage load.

• Side tilt carriage to left or right to align forks with load and engage load.

• Raise load slightly and then level carriage side to side.

• Travel in accordance with requirements set forth in Section 1 - General Safety

Practices.

Advertising