Assembly, Assembly -6 – JLG 24RS Service Manual User Manual

Page 106

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-6

– JLG Lift –

3121287

Assembly

NOTE:

Note: Make sure the upright is supported at all times by an
adequate lifting device.

1.

Use a block to allow the upright to sit level during the
assembly process. Refer to Figure 4-1., Block to Set the
Upright On.
Set the upright on the block.

2.

Install the timing link and secure in place with the
attaching hardware.

3.

Install the lower boom and secure in place with the
attaching hardware. It may help to place a block under
the front of the lower boom.

4.

Install the timing link and secure in place with the
attaching hardware.

5.

Rest the timing link against the upright and the lower
boom against the tension link.

6.

Install the lift cylinder and secure it in place with the
attaching hardware.

7.

Route the hydraulic hoses and electrical cables around
the timing link and secure in place with clamps and
straps.

Must raise the boom so this hole will align

Optional block to support boom

Step 5, Rest timing link against the upright

Step 6, Rest boom against the tension link.

A rubber pad should be placed in this area to help with paint protection,

Velcro Straps

Timing Link Clamp

Advertising