12 hose adjustment procedure, Hose adjustment procedure -17, Hose pull order -17 – JLG 24RS Service Manual User Manual

Page 117

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121287

– JLG Lift –

4-17

5.

Install the wear pad mount bracket on the top of the of
the telescope cylinder.

6.

Install the wear pad mount on the bottom of the tele-
scope cylinder. Activate the telescope function to gain
room to install the bracket. Place the bracket into the
boom and then assemble the wear pad to the bracket
inside the boom. Flip the assembly up into place and
attach to the cylinder rod.

7.

Install the upper master cylinder pivot pin. Apply JLG
Threadlocker P/N 0100011 to the retaining bolt and
secure the pivot pin in place with the keeper pin and
retaining bolt. Torque the bolt to 40 ft.lbs. (55 Nm)

8.

Install the lower master cylinder pivot pin. Apply JLG
Threadlocker P/N 0100011 to the retaining bolt and

secure the pivot pin in place with the keeper pin and
retaining bolt. Torque the bolt to 40 ft.lbs. (55 Nm).

4.12 HOSE ADJUSTMENT PROCEDURE

1.

Starting at the front of the machine, pull the hoses and
cables in the order shown in Table 4-1. Hose Pull Order,
through the carrier tube (Figure 4-10., Hose Adjustment
- Figure 3, loca
tion B).

2.

Pull the hoses and cables through the power track in the
same order as through the carrier tube. Position the
hoses and cables in the power track as noted in the
assembly drawings. Note the orientation of the marking
on the hoses and cables to insure there is no twist. (See

Table 4-1. Hose Pull Order

Pull

Order

Description

Qty

1

Control Cable, Upper Boom

1

2

Hose, 1/2" Airline (optional)

1

3

Cable, A/C 10/3 Upper Boom

1

Cable, 8/5 Upper Boom (optional)

1

4

Hose Assy, 10 [.375] JIC/JIC

2

5

Hose Assy, 6 [.25] JIC/JIC

2

Hose Assy, 6 [.25] JIC/JIC

1

Advertising