Commissioning, 3 sequencer status – Lenze ESV SMV frequency inverter User Manual

Page 59

Advertising
background image

Lenze SMVector 13465100 EDBSV01 EN v18

57

Commissioning

4.5.9.3

Sequencer Status

Segment 1 active

P714

P719

P724

P729

P734

P739

P744

P749

P754

P759

P764

P769

P774

P779

P784

P789

P794

TB30

Segment 16 active

Segment 15 active

Segment 14 active

Segment 13 active

Segment 12 active

Segment 11 active

Segment 10 active

Segment 9 active

Segment 8 active

Segment 7 active

Segment 6 active

Segment 5 active

Segment 4 active

Segment 3 active

Segment 2 active

End Segment active

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

Output Voltage

P150 = 10

Internal 0-10V reference

P792

End

Segment Delay

NOTE
On the “End Segment”, the output voltage is not present until after the end segment delay P792
has expired. On the other segments the output voltage is present on entry to the segment. The
same is true for the digital outputs.

(1)

The drive can only be restarted if the error message has been reset.

Advertising