6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84Dxxxx User Manual

Page 23: Before initial switch-on, 6commissioning

Advertising
background image

Lenze · Decentralised frequency inverter 8400 protec (EtherNet/IP™ option) · Communication Manual · DMS 3.0 EN · 07/2014 · TD17

23

6

Commissioning

6.1

Before initial switch-on

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6

Commissioning

During commissioning, plant-specific data such as motor parameters, operating parameters,

responses, and parameters for fieldbus communication are defined for the inverter. Lenze devices

use codes for this purpose.
The codes of the inverter and for communication are saved to the memory module in a non-volatile

data set.
In addition, there are codes for diagnosing and monitoring the stations.

Parameter reference

( 88)

6.1

Before initial switch-on

Stop!

Before you switch on the Inverter Drive 8400 protec for the first time, check the entire

wiring for completeness, short circuit, and earth fault.

Advertising