6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84Dxxxx User Manual
Page 23: Before initial switch-on, 6commissioning
![background image](/manuals/565921/23/background.png)
Lenze · Decentralised frequency inverter 8400 protec (EtherNet/IP™ option) · Communication Manual · DMS 3.0 EN · 07/2014 · TD17
23
6
Commissioning
6.1
Before initial switch-on
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6
Commissioning
During commissioning, plant-specific data such as motor parameters, operating parameters,
responses, and parameters for fieldbus communication are defined for the inverter. Lenze devices
use codes for this purpose.
The codes of the inverter and for communication are saved to the memory module in a non-volatile
data set.
In addition, there are codes for diagnosing and monitoring the stations.
6.1
Before initial switch-on
Stop!
Before you switch on the Inverter Drive 8400 protec for the first time, check the entire
wiring for completeness, short circuit, and earth fault.