Standard devices with a power of 55 kw, Mounting with fixing brackets (standard), Mechanical installation – Lenze E82EV 8200 vector 15kW-90kW User Manual

Page 129

Advertising
background image

Mechanical installation

Standard devices with a power of 55 kW

Mounting with fixing brackets (standard)

4

l

129

EDK82EV903 DE/EN/FR 5.1

4.4

Standard devices with a power of 55 kW

4.4.1

Mounting with fixing brackets (standard)

Mounting material required from the scope of supply:

Description

Use

Quantity

Fixing bracket

Drive controller fixing

4

Hexagon head cap screw M8 × 16 mm
(DIN 933)

Mounting of fixing bracket to the drive controller

4

Washer

Æ 8.4 mm (DIN 125)

For hexagon head cap screw

4

Spring washer

Æ 8 mm (DIN 127)

For hexagon head cap screw

4

Controller variant "2xx" (without fully assembled footprint filter)

For this mounting variant you require controller type E82EVxxxK4B2xx.

)

Note!

Before assembling the controller, please read the documentation for the
components connected on the supply side (mains choke, filter).

a

c1

e

b1

d

d1

b

l

c

³ 50 mm

³ 50 m

g

m

k

0

³ 100 mm

³ 100mm

9300vec175



Loosen both screws to be able to remove the housing cover. The assembly kit is located under
the housing cover.

‚

Installation of mounting angles

ƒ

Dimensions

0

Arrange the controllers side by side with spacing to be able to disassemble the eyebolts.

Advertising