Electrical installation – Lenze EMB934x User Manual

Page 112

Advertising
background image

Electrical installation

Regenerative power supply modules EMB9341 and EMB9342
Power connections

5

l

112

EDBMB9340 DE/EN/FR 12.0

L1

PE

L2 L3

L1'

PE

L2' L3'

L1 L2 L3 +UG -UG

PE

PE

2

0

8

M6

M5

1 2

34

5 6

7

0

<

;

L3’ L2’ L1’ L3.2 L2.2 L1.2

Synchronization INPUT

OUTPUT

:

9

EZN3A0120H012
EZN3A0088H024

EMB9341
EMB9342

=

PE

L3’ L2’ L1’ L3.2 L2.2 L1.2

Synchronization INPUT

OUTPUT

9340vrm019

Fig. 5−5

Wiring of the power connections EMB9341 and EMB9342

0 PE threaded bolt

7 Nut M5

1 Nut M5

8 Shield sheet

2 Fixing bracket for shield sheet

9 Mains cable

3 Serrated lock washer

: Supply cable of the regenerative power supply

module

4 PE core

; Supply cables for devices in the DC−bus connection

5 Washer

< Wiring for internal mains synchronisation

6 Spring washer

= Wiring for external mains synchronisation

Advertising