Mechanical installation, The rated data remain valid. dimensions – Lenze EMB934x User Manual

Page 93

Advertising
background image

Mechanical installation

Regenerative power supply modules EMB9341 and EMB9342

Mounting of EMB9341−E / EMB9342−E with "push−through" technique

4

l

93

EDBMB9340 DE/EN/FR 12.0

4.2.3

Mounting of EMB9341−E / EMB9342−E with "push−through" technique

In order to reduce the heat generation in the control cabinet, the heatsink of the
regenerative power supply modules EMB9341−E and EMB9342−E can be mounted outside
the control cabinet. Therefore, a mounting frame with seal (accessories) is required.

ƒ

Distribution of the power loss:
– approx. 65 % by separated cooler (heatsink and blower)
– approx. 35 % inside the regenerative power supply

ƒ

The rated data remain valid.

Dimensions

e

f

d1

d1

d

b1

b

c

c1

a1

a

g

>

100

mm

>

100

mm

9340vrm015

Fig. 4−4

Dimensions of EMB9341−E and EMB9342−E for mounting in push−through technique

Dimensions of regenerative power supply module

Assembly frame

Mounting cutout

a

a1

b

b1

c

c1

d

d1

e

f

g

Order no.

Height

Width

[mm]

[mm]

EMB9341−E

169.5

135

385.5

350

117

152.5

366

105.5

250

92

6.5

EJ0038

350 ±3

139 ±3

EMB9342−E

169.5

135

385.5

350

117

152.5

366

105.5

250

92

6.5

EJ0038

350 ±3

139 ±3

Advertising