Chapter 3 Using the RDM

Configuring the SA300

38

SA300 Substation Automation Unit

Available wiring modes are listed in the following table.

Wiring Mode

Description

3OP2

3-wire Open Delta using 2 CTs (2 element)

4Ln3

4-wire Wye using 3 PTs (3 element), line-to-neutral voltage readings

3dir2

3-wire Direct Connection using 2 CTs (2 element)

4LL3

4-wire Wye using 3 PTs (3 element), line-to-line voltage readings

3OP3

3-wire Open Delta using 3 CTs (2½ element)

3Ln3

4-wire Wye using 2 PTs (2½ element), line-to-neutral voltage readings

3LL3

4-wire Wye using 2 PTs (2½ element), line-to-line voltage readings

3bLn3

3-wire Broken Delta using 2 PTs, 3 CTs (2½-element), line-to-neutral voltage readings

3bLn3

3-wire Broken Delta using 2 PTs, 3 CTs (2½-element), line-to-line voltage readings

To select a setup option:

1. Press SELECT to activate the middle window.
2. Use the Up/Down arrow keys to scroll to the desired option.

To change the display option:

1. Press SELECT to activate the lower window.
2. Use the Up/Down arrow keys to set the desired option.
3. Press ENTER to confirm your changes and to store your new

setting, or press ESC to discard changes.

To exit the menu:

From the middle window, press ESC or ENTER.

:

Notes

1. Always specify the wiring mode and transformer ratings prior to setting up setpoints and

triggers for the fault and power quality recorders.
2. The maximum value for the product of the phase CT primary current and PT ration is
10,000,000. If the product is greater, the powers and power factors are zeroed.

Demand Setup Menu

This menu allows you to configure the time parameters for calculating power,
ampere, volt and harmonic demands. To enter the Basic Setup menu, select “dnd”

from the menu list.

The following table lists available options, their default settings and ranges.

Label Option

Range

Default

Description

P.dP

Power demand period

1, 2, 5, 10, 15,

20, 30, 60 min

15

The length of the demand period for

power demand calculations

n.P.dP

The number of demand
periods in the sliding
window

1-15

1

The number of demand periods to be
averaged for sliding window demands

d.Snc.In Power demand sync

source

Clc (device

clock), di.In.1 -
di.In.48 (digital
input 1-48)

Clc

The source input for synchronization of

the demand intervals. If a digital input is
specified as the source, a pulse front
denotes the start of the demand interval

A.dP

Ampere demand period 0 - 9000 sec

900

The length of the demand period for
ampere demand calculations

U.dP

Volt demand period

0 - 9000 sec

900

The length of the demand period for volt

demand calculations

H.dP Harmonic

demand

period

0 - 9000 sec

900

The length of the demand period for
harmonic demand calculations

SELECT

ENERGY

ENTER

ENERGY

ENTER

CHG

S

dnd

dnd

15

P.dP

Advertising