Chapter 2, Frame 2 installation, Mounting considerations – Rockwell Automation 20L PowerFlex 700L Liquid-Cooled Adjustable Frequency AC Drive User Manual

Page 27: Total area required for drive installation, Mounting considerations -1, Total area required for drive installation -1

Advertising
background image

PowerFlex 700L Frames 2, 3A, and 3B Liquid-Cooled AC Drives User Manual

Publication 20L-UM001E-EN-P

Chapter

2

Frame 2 Installation

Because most start-up difficulties are the result of incorrect wiring, take
every precaution to verify that the wiring is completed as instructed. Read
and understand all items before starting actual installation.

Mounting Considerations

Total Area Required for Drive Installation

Overall drive dimensions are shown in

Figure 2.1

as an aid in calculating

the total area required for installing Frame 2 drives.

Topic

Page

Mounting Considerations

2-1

Equipment Lifting

2-3

Mounting Requirements

2-6

Verifying the Drive’s Watts Loss Rating

2-7

Removing the Drive Cover

2-7

Removing the Active Converter Control Cassette

2-7

Removing the Inverter Control Cassette

2-8

Determining Wire Routing for Control, Ground, Drive Input, and Motor Output

2-9

Grounding the Drive

2-11

Ungrounded or Resistive Grounded Installations

2-11

Power Wiring

2-12

Control Wiring

2-18

Synchronization Connections

2-20

DPI Connections for Frame 2 Drives

2-22

Coolant Loop Connections

2-22

!

ATTENTION: The following information is merely a guide for
proper installation. Rockwell Automation does not assume
responsibility or liability for the compliance or noncompliance to
any code, national, local or otherwise for the proper installation
of this drive or associated equipment. A hazard of personal injury
and/or equipment damage exists if codes are ignored during
installation.

Advertising