4-8

Cooling Loop Installation

PowerFlex 700L Frames 2, 3A, and 3B Liquid-Cooled AC Drives User Manual
Publication 20L-UM001E-EN-P

Frame 3A or 3B Complete Drive

For locations of the coolant inlet and outlet connections on PowerFlex 700L
Frame 3A Complete Drives, see

Figure 3.18

(front and side views). For

locations on Frame 3B Complete Drives, see

Figure 3.21

(front and side

views).

The rated working pressure of the Frame 3A and 3B Complete Drive is 6.89
bar (100 psi). Size coolant supply and return lines for 76 LPM (20 gpm) /
6.89 bar (100 psi) service with a maximum operating temperature of 40 °C
(105 °F). The required operating flow rate is specified in

Table 4.C

.

Before connecting the coolant hoses to the Complete Drive hose fittings
located at the lower-right back corner of the drive enclosure, see

Figure 4.8

and perform these steps.

1. Remove the factory-installed hose fitting plugs and the enclosure wall

dome plugs.

2. Install the factory-supplied snap bushings to the enclosure wall.

Figure 4.8 Frame 3A and 3B Complete Drive Coolant Connection Components

Frame 3A and Frame 3B Complete Drive coolant connections are made
using 37 degree flare fittings which have a:

• 1-inch nominal size

• “-16” SAE dash size

• 1-5/16-12 UN/UNF-2B external thread size

The mating connection is shown in

Figure 4.9

. To make the mating coolant

connection, follow these steps.

1. Assemble the mating version of the fitting (with swivel nut) to each

fluid fitting, and tighten to a wrench resistance of approximately 3.4
N

•m (30 lb•in).

Enclosure Wall

Snap Bushings

Enclosure Wall

Dome Plugs

Hose Fitting Plugs

OUTLET

INLET