Control synchronization cable, Control synchronization cable -36 – Rockwell Automation 20L PowerFlex 700L Liquid-Cooled Adjustable Frequency AC Drive User Manual

Page 84

Advertising
background image

3-36

Frame 3A and 3B Installation

PowerFlex 700L Frames 2, 3A, and 3B Liquid-Cooled AC Drives User Manual
Publication 20L-UM001E-EN-P

Control Synchronization Cable

To enable synchronization between the Inverter control board and the
Converter control board, you must connect a synchronization cable to each
board. The connection method is different for PowerFlex 700L drives with
700 Vector Control than for 700S Phase II Control. The 700 Vector Control
synchronization cable connection is shown in

Figure 3.33

. The 700S Phase

II Control synchronization cable connection is shown in

Figure 3.34

. The

appropriate version of the cable is provided in a plastic bag with each
Inverter Power Module. Only one Inverter Power Module may be coupled to
a Converter Power Module.

Figure 3.33 Frame 3B 700 Vector Control Synchronization Cable Connection

1

15

P1 Terminal Block for

Control Synchronization

Cable Connection

TB2 Header for

Control Synchronization

Cable Connection

Control Synchronization Cable

(Factory-Provided)

Active Converter Power Module

Inverter Power Module

P1-7

TB2-2

TB2-1

P1-8

Active Converter

Control Cassette

700 Vector

Control Cassette

24 VDC

DC POSITIVE

DC NEGATIVE

1 120 VAC

2 PRECHARGE COIL

6 INDUCTOR OVERTEMP

WIRE RANGE:
24-10 AWG
(0.2-4 MM)

4 CHARGE FEEDBACK

GATE ENABLE

STRIP LENGTH:
0.31 IN (8 MM)
TORQUE:
8 IN-LB
(0.9 N-M)

24 VDC

DC POSITIVE

DC NEGATIVE

1 120 VAC

2 PRECHARGE COIL

6 INDUCTOR OVERTEMP

WIRE RANGE:
24-10 AWG
(0.2-4 MM)

4 CHARGE FEEDBACK

GATE ENABLE

STRIP LENGTH:
0.31 IN (8 MM)
TORQUE:
8 IN-LB
(0.9 N-M)

Advertising